01
Identify the specialist early
Tell the roofing contractor about the lightning protection system and involve an appropriately qualified specialist in planning. Ask how roof access, attachments, and any temporary removal will be handled. Record the existing arrangement before work starts. Do not ask a roofing crew to redesign or casually relocate a system outside its expertise.
02
Plan reinstatement and records
Coordinate the sequence so roofing details and system attachments are addressed by the responsible trades. Ask the specialist what inspection or documentation is needed after the work. Keep those records with the roof closeout package and identify any future access requirements. The aim is to preserve both the roof assembly and the specialist system through a coordinated project.