Detail guide · Guide 22 of 101

Flashing chimneys, walls and penetrations in slate

Many apparent slate leaks begin where the roof meets something else. These transitions must manage movement and water without relying on exposed sealant as the primary defense.

01

Separate roof flashing from wall protection

Step or base flashing works with counterflashing to direct water back onto the roof while allowing the materials to move. Masonry reglets, siding transitions and cladding terminations must be detailed for the actual wall construction.

02

Large obstructions change drainage

Wide chimneys and curbs can hold snow, debris and water. Crickets or saddles may be needed to divide flow and prevent a flat collection area. The design should be established before field slate reaches the obstruction.

03

Keep penetrations serviceable

Plumbing vents, equipment and anchors should use durable flashings that can be inspected and renewed. Large exposed beads of sealant or cement are maintenance clues, not substitutes for correctly lapped metal and slate.

Further technical reading

Recognized sources behind this guide

Slate Boss writing is original. These links provide additional standards, preservation guidance and industry reference material.

View all slate roofing guides