Planning for underlayment exposure during a slate project

A roof's temporary condition during construction should be considered separately from its completed assembly.

By Slate Roofing USA · Published

01

Use the specified product information

Ask the contractor which underlayment is proposed and how its installation and exposure requirements affect the schedule. Do not assume that every membrane or felt can remain uncovered for the same period or under the same conditions. Review the plan for openings, transitions, and weather protection before the existing roof is removed.

02

Keep temporary and permanent work connected

Discuss how the roof will be closed at the end of each work period and who assesses temporary protection after weather events. If the project is delayed, have the contractor review the actual condition and applicable product guidance before continuing. Keep records of any replacement or corrective work. Temporary protection is part of project planning, not proof that an unfinished roof performs like the final slate assembly.

Further reading

Background and reference material

This original planning article offers questions and checklists for your project. The references below provide broader technical background; product instructions and a qualified assessment determine the details for an individual roof.

Related slate roofing guides

View all slate roofing guides