01
Resolve the route before cutting
Have the mechanical contractor and roofer identify the intended outlet location and the required connection. Ask whether an existing penetration will remain, move, or be removed. The decision should account for the building design and applicable requirements rather than choosing a convenient hole after the roof is complete.
02
Coordinate the roof scope
Record who supplies the outlet component, who forms the roofing connection, and who restores abandoned openings. Provide access for checking the relevant work before it is concealed. Keep final photographs and product references with the roof file. Coordination at this stage is simpler than trying to assign responsibility after several trades have each finished their separate tasks.
