01
Protect people and interiors first
Control electrical hazards, collect water and move vulnerable contents. Photograph conditions before disturbance for the owner, contractor and insurer.
02
Use the least damaging exterior measure
Access may require a lift or staging. Avoid nailing through broad areas of sound slate or smearing cement across faces. Secure temporary protection to stable structure using a planned method.
03
Schedule permanent repair promptly
Temporary materials can loosen, trap water or conceal worsening conditions. Mark the protected area and provide the next contractor with photographs and a description of attachments.
