01
Review material early
Have the slater check the delivered pieces against the intended repair: size, condition, thickness, and compatibility with the existing layout. Where appearance is sensitive, compare accepted samples before the work date. Confirm that special repair components and flashing materials are also available.
02
Align the visit with readiness
Ask the contractor to identify what must be on site before scheduling equipment and labor. If a substitution is needed, resolve it while there is time to review it properly. Early checking does not guarantee that concealed conditions will be known, but it removes avoidable uncertainty about visible, already-delivered material and helps the planned visit accomplish its intended scope.