Contractors: Get listed free

Detail guide · Guide 74 of 324

Slate roof rake and gable-edge details

The rake is both a visual line and a high-wind edge. Slate projection, backing, fastening and trim need consistent control from eave to ridge.

Email this guide

01

Set a straight durable edge

The substrate and trim must support the intended slate projection. Excessive overhang leaves corners vulnerable; too little can expose wood or direct water onto the wall.

02

Coordinate the starter and verge

The under-eave course, first field course and gable edge meet at the lower corner. Plan that junction so laps remain complete and the edge does not begin with a weak cut.

03

Protect against wind uplift

Perimeter zones often experience higher design pressures. Fastening and edge details should follow the project’s wind requirements and accepted slate practice.

Ready to move your slate project forward?

Get help sourcing slate tiles, matching existing material or finding a roofer. Tell Slate Boss your location, project details and timing.

Further reading

Recognized sources behind this guide

Slate Boss writing is original. These links provide additional standards, preservation guidance and industry reference material.

Related slate roofing guides

View all slate roofing guides